Solutionist of VEGA projects

Title of the project: Design, development and implementation of modules of ecological systems of raw material transport in mining and construction industry by CAD systems Pro/Engineering and Catia.
Number of the project: 1/3307/06
Duration of the project: 2006-2008
Project leader: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Research of conditions affecting degradation and reduction of lifetime of components of pipe conveyors using advanced mathematical and simulation methods for increasing of their reliability.
Number of the project: 1/0095/10
Duration of the project: 2010-2011
Project leader: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Research of effect of material characteristics and technological parameters of conveyor belts on the size of contact forces and kinematic resistance of pipe conveyors using experimental and simulation methods.
Number of the project: 1/0922/12
Duration of the project: 2012-2015
Project leader: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Research and development of new progressive approaches on the base of non-destructive testing for detection and analysis of damage of internal structures of steel-cord and rubber-textile conveyor belts using experimental and simulation methods.
Number of the project: 1/0063/16
Duration of the project: 2016-2019
Project leader: prof. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims

 

Co-solutionist of VEGA projects

Title of the project: Projection and simulation of ecologically oriented conveying systems and elements of transport devices.
Number of the project: 1/8074/01
Duration of the project: 2001-2003
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Optimization of technical and economical parameters of construction elements of transport devices and equipment by obtaining and processing of raw materials.
Number of the project: 1/11294/04
Duration of the project: 2004-2006
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Development of methods for creation of information systems of raw materials transport in construction and mining industry.
Number of the project: 1/1120/04
Duration of the project: 2004-2006
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Application of modern mathematical and statistical methods by creation of new ecological systems of transport in construction and mining industry.
Number of the project: 1/2162/05
Duration of the project: 2005-2007
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Optimization of technical and economic parameters of loading, transport and storage of raw materials.
Number of the project: 1/4168/07
Duration of the project: 2007-2009
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Design of integrated transport system model for raw materials controlled by information systems with implementation of green logistics.
Number of the project: 1/0864/10
Duration of the project: 2010-2011
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Selected problems of mechanical systems.
Number of the project: 1/0453/10
Duration of the project: 2010-2011
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Automatized system for modelling of mechanized construction processes with application of the method of multi-criteria optimization.
Number of the project: 1/0184/12
Duration of the project: 2012-2014
Co-solutionist: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: project goes on


Title of the project: Development of methods and new approaches to projection of input, interoperable and output storehouses and this allocation in mining, metallurgical and construction industry.
Number of the project: 1/0036/12
Duration of the project: 2012-2015
Co-solutionist: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: project goes on

 

Solutionist of KEGA projects

Title of the project: Virtual laboratory for education of computer simulation and distributed/parallel calculation based on the method of finite elements.
Number of the project: 018TUKE-4/2016
Duration of the project: 2016-2018
Project leader: prof. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


Title of the project: Support of education for development of competences in the field of logistics in accordance with the concept of Industry 4.0 by virtual laboratory of computer simulation.
Number of the project: 012TUKE-4/2019
Duration of the project: 2019-2021
Project leader: prof. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: project goes on

 

Co-solutionist of KEGA projects

Title of the project: College textbook “Means of automatized production” by interactive multimedia form for STU Bratislava and TU Košice.
Number of the project: 006STU-4/2015
Duration of the project: 2015-2017
Co-solutionist: prof. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: project goes on


Title of the project: Modern education tools and methods for formation of creativity and increasing of practical skills and habits of graduates of technical branch at universities.
Number of the project: 013TUKE-4/2019
Duration of the project: 2019-2021
Co-solutionist: prof. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: project goes on

 

Co-solutionist of bilateral projects APVV

INTERNATIONAL SERBIAN-SLOVAK PROJECT

Title of the project: Research of ecological conveying of ore
Duration of the project: 2003-2006
Co-solutionist: Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


INTERNATIONAL SERBIAN-SLOVAK PROJECT

Title of the project: Information systems and their effective use by transport control
Duration of the project: 2008-2009
Co-solutionist: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims


INTERNATIONAL SERBIAN-SLOVAK PROJECT

okTitle of the project: Design of logistics model of mining enterprise with application of principles of transport and reverse logistics
Duration of the project: 2009-2010
Project leader: prof. Miloš Grujič
Co-solutionist: doc. Ing. Gabriel Fedorko, PhD.
Evaluation of the project: executed aims

Gabriel Fedorko